1. Verify field dimension.
2. Check start point.
3. Establish control line from Starting point.
9. Install panels around columns.
10. Install panel at curbs and perimeter walls.
4. Spread pedestals.
5. Level pedestals in proper position.
6. Attach pedestals to the subfloor with adhesive
11. Locking panels using fixing screws.
12. Attach the tiles to the floor with adhesive.
7. Create the "L" section.
8. Install "OA" floor panels.
13. Check carpet tiles for (a) Loose tufts of carpet (b) Panels which were not properly placed.
14. Check-all accessories forproper placement.
1. Verify field dimension.
2. Check start point.
3. Establish control line from Starting point.
9. Install panels around columns.
10. Install panel at curbs and perimeter walls.
4. Spread pedestals.
5. Level pedestals in proper position.
6. Attach pedestals to the subfloor with adhesive.
11. Locking panels using fixing screws.
7. Create the "L" section.
8. Install "AF" floor panels.
12. Check flooring surface.
13. Check-all accessories for proper placement.