OA/AF FLOOR
1. Verify field dimension.
2. Check start point.
3. Establish control line from Starting point.
4. Spread pedestals.
5. Level pedestals in proper position.
6. Attach pedestals to the subfloor with adhesive
7. Create the "L" section.
8. Install "OA" floor panels.
9. Install panels around columns.
10. Install panel at curbs and perimeter walls.
11. Locking panels using fixing screws.
12. Attach the tiles to the floor with adhesive.
13. Check carpet tiles for (a) Loose tufts of carpet (b) Panels which were not properly placed.
14. Check-all accessories forproper placement.
1. Verify field dimension.
2. Check start point.
3. Establish control line from Starting point.
4. Spread pedestals.
5. Level pedestals in proper position.
6. Attach pedestals to the subfloor with adhesive.
7. Create the "L" section.
8. Install "AF" floor panels.
9. Install panels around columns.
10. Install panel at curbs and perimeter walls.
11. Locking panels using fixing screws.
12. Check flooring surface.
13. Check-all accessories for proper placement.